August visit progress pictures

Kitchen

Pizzeria

Rear of the house

Front of the house

Some disagreements / discussions over washing the facade

We returned from a day out with Jesse and Tess to find that the scaffolding had been removed at the front. When we enquired about the washing, Klodian insisted that it had been done. This was blatantly untrue.

This meeting was to test washing with a dilute acid to better reveal the stones and to bring out the colour of the brickwork.

A bit of a drain issue

The blockage was cleared from inside as the most useful drain cover was hidden by debris from the facade renovation.

Some AC teething troubles