Today, we received a first cut of the quote from Michele. Gino needs to verify that it meets the partameters of the design we have permission for and there are some omissions that need to be included (hand rail, shower).
The quote actually comprises quotes from three separate companies: Michele’s, the excavator and the pool supplies company.
Michele has opted to mix his own concrete rather than get a delivery. I think there are a couple of reasons for this as our drive is not wide enough to accomodate a cement mixer:
- The distance from the road to the pool location.
- The road would have to be closed for the duration of the delivery (requiring permission from the comune),
The good news is that the total compares favourably to the quote we already have from Klodian.