Pool progress – May visit

Monday 6th – day of arrival

Apparently the hole is not big enough

Tuesday 7th

Total washout due to rain storm. Massive rain storm in the morning. Draining water from the hole and battling with drains in the afternoon.

Wednesday 8th

Hole enlarged and laying of the base started

Thursday 9th

Reinforcement in preparation for delivery of concrete next week

Friday 10th

Now waiting for concrete delivery by mixer on Wednesday 15th

Power to the workers

Monday 13th

Michele has posted road closure signs in preparation for Wednesday concrete delivery.

Wednesday 15th

Arrival and setup
The pour
Clean up and departure
Michele’s time lapse video

Click here to watch

The builders broke the garden gate and the blacksmith came to fix it
Concrete set by Sunday

Monday 20th

Tuesday 21st

Wednesday 22nd

Thursday 23rd

Friday 24th

Walls filled with concrete
Followed by a barbeque

Meat fest including massive Fiorentina steaks, wine and home made limoncello

Opening wine builder style

Click here to watch

a final meeting with Michele, Gino and Alex

Michele was a bit pissed