The scaffolding has been erected for the exterior work consisting of:
- Cleaning and repointing of the facades on 3 sides
- Rendering the back of the house
- Insulating the roof
- Installation of the photovoltaic panels
- Installation of new shutters
Aparently there was some kind of heated discussion between our builder and the neighbours. Some repairing of relationships needed when we get there.





You must be logged in to post a comment.