Second floor bathroom

This is the first bit of internal work we had done. It’s a simple refurb of the existing bathroom. We had never used the shower, as the tiled base looked likely to leak. This was to be the one bathroom with a bidet (you must have at least one one in Italy). We reused the existing toilet and bidet to keep costs down. We replaced the hot water tank with a larger one to allow multiple showers. It will also provide the hot water for the kitchenette.

As purchased

Demolished

Plumbed through the living room

Tiled

Completed

Oops!

Leave a Reply